Sydney · Asphalt & Bitumen Pavements
AMC0 & AMC00 Prime
Primer and primerbinder application to bind the base course before sealing or asphalt placement.
The work
AMC0 Prime and AMC00 Prime
“ AMC0 Prime ” or “ AMC00 Prime ” Cutback Bitumen Primes are an essential part of any flexible pavement design.
A Prime :
- Is The Initial Treatment To Prepare The Surface For Any Subsequent Spray Seal Or Asphalt Layer
- Provides A Surface For Subsequent Treatments To Bond To
- Assists In Waterproofing The Pavement
- Penetrates The Surface Of The Prepared Pavement
- Settles The Road Base & Deals With Surface Dust
- Minimise The Drain-Down Of Binder From Overlying Spray Seals Into The Base
- Forms The Basis For The Performance Of Any Future Spray Seal Or Asphalt Layer
- Should Be Used With Any New Flexible Pavement
- Should Be Allowed To Cure For A Minimum Of 2 -3 Days, Prior To Any Spray Or Asphalt Seal
Once cured, the primed surface should be hard, dry and have a black to dark brown appearance.
The Success Of Priming Relies On:
- The Preparation & Finished Condition Of Base Materials
- Selection Of An Appropriate Primer
- Selection Of appropriate Application Rates
- Suitable Weather Conditions
Generally, primers are applied at rates between 0.5 and 1.1 L/m2
Priming pavements that are too damp will prevent penetration of the primer.
They may require excessive time to dry and cure, and residue left on the surface may affect the next treatment.
The road base to be primed should be well compacted and firm. The surface should be allowed to dry out on top and to a depth of 5–10 mm in order to allow the prime to penetrate into the pavement pores and provide a strong bond for the final treatment.
A loose and powdery base will not allow the prime to be effective.
Ring Us Now and let us help you with your pavement needs
Ph 02 8065 8011
We look forward to working together
FAQ
AMC0 & AMC00 Prime questions
Straight answers to what councils, contractors and property managers ask us most.
What are AMC0 and AMC00 primers?
Cutback bitumen primers applied to a prepared base course before sealing or asphalt placement, so the new surface bonds properly to the base.
Why does a base need priming?
Without a primer the spray seal or asphalt cannot key into the base course, which leads to early delamination and surface failure. Priming binds the surface of the base and gives the next layer something to adhere to.
Related
Other asphalt & bitumen pavements services

Asphalt Patching
Cut, clean and reinstate failed sections so the repair sits flush and holds under traffic load.
View service
Asphalt Paving
New asphalt surfaces for roads, carparks, expressways and large residential works, laid with our own pavers and rollers.
View service
Crack Sealing
Specialised flexible sealant that seals the crack while the pavement expands and contracts, keeping water out of the base.
View service
Rejuvenation
Restore binder in an oxidised surface and add years of life before a full resurface becomes necessary.
View serviceGet a quote
Quote a amc0 & amc00 prime job
Send us the location and what is failing. We inspect before we quote, so you find out whether it is a surface or a base problem first.
Need amc0 & amc00 prime in Sydney?
Send us the location and a photo and we will tell you what the pavement actually needs.
